Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080170
    Date de publication: 29 août 2008

    Promoteur – Intermédiaire Financier

    Romania

    Lieu

    Description

    The project aims at co-financing eligible projects for EU grant assistance under the structural and cohesion funds during the programming period 2007-2013 within 3 sector operational programmes as well as potential projects in the identified sectors under the NSRF/National Development Plan which do not benefit from grant support during the present programming period.

    Objectifs

    The facility would contribute to the development and implementation of key infrastructure projects in line with the EU programming period 2007-2013 as well as to enhance the speedier absorption of EU grants by offering the possibility of availability of funds at an early stage of project implementation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 1000 million.

    Coût total (montant approximatif)

    EUR 12 billion.

    Aspects environnementaux

    The project, being a multi-sector multi-scheme operation classified as Framework Loan/Structural Programme Loan, will have a number of effects on the environment, including reduction of pollution, reduced use of energy, increase of safety, improved water and wastewater services. The Bank will require from the promoter to act according to the provisions of the relevant EU directives, including SEA, EIA, Habitats, Birds Directives, as transposed in the national law.

    Passation des marchés

    The promoter as a public administration entity is required to follow the EU public procurement rules (2004/18/EC) including publication of contract notices in the EU Official Journal as implemented by national law.

    Statut

    Signé - 24/11/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Infrastructure composite Transports Eau, assainissement