Date de publication: 15 avril 2020
Promoteur – Intermédiaire Financier
REPUBLIQUE DU CAMEROUNLieu
Description
The project will finance the renewal of one section (about 330 km) of a single-track non-electrified railway line between Belabo and Ngaounderé.
Objectifs
The aim is to increase the quality, availability and reliability of rail services in Cameroon. It is expected to generate time and vehicle operating cost savings, reduce the maintenance costs of the infrastructure and improve railway safety. It should also contribute to the modal shift from road to rail, thus bringing climate, environmental and road safety benefits.
Commentaires
The project is also in full support of the Sustainable Development Goals (SDG's), as improved railway transport infrastructure (SDG 9) is expected to facilitate the free movement of passengers and freight between the north and south of the country, while reducing the country's GHG emissions (SDG 13) and transportation costs, thereby supporting economic development (SDG 8) and inequality reduction (SDG 11). The project will also contribute to the implementation of Cameroon's Nationally Determined Contributions (NDC), agreed under the COP 21 Paris Agreement, which prioritizes the development of low-carbon transportation.
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Under Global Europe NDICI guarantee
Under EFSD+ Guarantee
Montant BEI envisagé (montant approximatif)
EUR 123 million
Coût total (montant approximatif)
EUR 243 million
Aspects environnementaux
The project will be implemented on the existing alignment of the railway and within the existing right of way; therefore potential negative environmental and social impacts are likely to be minor. If situated in the EU, the project would likely fall within Annex II of Directive 2011/92/EU as amended by the Environmental Impact Assessment (EIA) Directive 2014/52/EU and therefore be subject to screening. The project will be undergo an Environmental Social Impact Assessment (ESIA) in line with the national legislation and the EIB environmental and social standards.
Passation des marchés
The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.
Statut
Signé - 31/12/2021
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).