Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140105
Date de publication: 29 août 2014

Promoteur – Intermédiaire Financier

PUBLIC ENTITY(IES)

Lieu

Description

The water and wastewater component will primarily support improvements in water supply, metering and wastewater networks. The solid waste management part of the project comprises construction of sanitary landfills and closure of the existing dumpsites, as well as supply of waste collection equipment for the local municipal companies.

Objectifs

The project addresses the most urgent needs in solid waste management amid financial constraints. The project will provide sanitary landfills serving over 600,000 inhabitants that will reduce adverse environmental, health and climate impacts from current dumpsites that will be closed and eventually rehabilitated. It is also expected to improve operational efficiency of municipal solid waste collection.
The water supply component is expected to increase service level in terms of reliability of water systems and quality of drinking water in the service area. In some cities, projects will include also a wastewater component that is expected to contribute to the improvement of public health and reliability of the system.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 20 million

Coût total (montant approximatif)

EUR 80 million

Aspects environnementaux

The project is expected to bring an overall positive impact on environment and public health by providing access to better quality drinking water and by collection and treatment of wastewater. The solid waste component is intended to replace the dumpsites with sanitary landfills and thereby limit, to the extent possible, the adverse impact of disposal activities on environment, health and climate. Compliance of the individual projects with applicable national EIA legislation will be verified during the appraisal and allocation.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 28/05/2016

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Kirghizistan Eau, assainissement Déchets solides