    Référence: 20140022
    Date de publication: 15 avril 2014

    Promoteur – Intermédiaire Financier

    VORARLBERGER ILLWERKE AG

    Lieu

    Description

    The project comprises two pumped storage schemes, Obervermuntwerk II of 360 MW and Rellswerk with 13 MW, for hydroelectric power generation and storage, located in the valley of Montafon in the Austrian region of Vorarlberg, and required reinforcements of the substation in Bürs. The investment will add balancing capacity to the German power system and contribute to security of supply.

    Objectifs

    The project will store electrical energy from the public grid by pumping water from a lower into an upper reservoir at times of reduced electricity demand and low prices. At times of high electricity demand and correspondingly high prices, the water will be released back to the lower reservoir to drive turbines and generate electricity. The project will contribute to covering peak demand as well as to providing ancillary services in the integrated European Grid system.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 280 million

    Coût total (montant approximatif)

    EUR 566 million

    Aspects environnementaux

    The project is an expansion of an existing hydroelectric power generation plant. The project falls under Annex II of the EIA Directive 2011/92/EU. Here, the competent authority in line with Austrian environmental law (UVP-G 2000) requested an Environmental Impact Assessment (EIA) including public consultation. The environmental permit was granted by the Supreme Administrative Court in Austria in January 2014, with no further appeal.

    Passation des marchés

    The European Commission has exempted the generation of electricity in Austria from public procurement provisions by Decision 2008/585/EC.

    Statut

    Signé - 24/06/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Énergie