Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120184
    Date de publication: 16 août 2012

    Promoteur – Intermédiaire Financier

    PJSC Myronivsky Hliboproduct

    Lieu

    Description

    Construction of agri-food production facilities to build resilience to adverse weather events and crop yield variability. The project involves the construction of two grain-storage facilities, one fodder-processing plant and one sunflower-crushing plant.

    Objectifs

    The project forms part of a major investment programme being implemented over several years to expand production capacity and improve resource efficiency and environmental sustainability. In addition, the project enhances food security, as it promotes the self-sufficiency of the host country in terms of locally processed feed and food ingredients and increased storage capacity, thus improving the resilience of the Ukrainian agri-food sector to adverse weather shocks, mainly droughts (climate change adaptation).

    Commentaires

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 85 million

    Coût total (montant approximatif)

    EUR 172 million

    Aspects environnementaux

    Within the EU the project would, by virtue of its technical characteristics, fall within the scope of Annex II of Environmental Impact Assessment (EIA) Directive (2011/92/EU). An environmental impact study (EIS) was required under Ukrainian legislation. This was completed in 2010. Based on the EIS, the Ukrainian authorities granted the ecological permit in 2010 to the promoter, which is a condition for granting the construction permit. The project incorporates best available techniques for emissions abatement and air and water emissions are expected to be within the limits represented by international and European standards. The generated waste is neither significant nor of a dangerous nature and corresponding and appropriate disposal mechanisms have been already established.

    Passation des marchés

    The promoter will be required to comply with the Bank's Guide to Procurement.

    Statut

    Signé - 1/12/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ukraine Industrie