Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120162
    Date de publication: 26 septembre 2012

    Promoteur – Intermédiaire Financier

    COMMUNAUTE URBAINE DU GRAND NANCY

    Lieu

    Description

    Creation of two high-quality Bus Rapid Transit (BRT) routes and acquisition of vehicles, construction of two intermodal hubs and two park-and-ride facilities in the city of Nancy.

    Objectifs

    - Encourage sustainable development in the city.
    - Promote the use of public transport and reduce the number of individual journeys by motorised means of transport.
    - Share public areas through greater emphasis on more sustainable travel modes.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 100 million

    Aspects environnementaux

    The project comes under Annex II to the EU Directive on environmental impact assessments (EIAs) according to which the need for a comprehensive EIA is decided on the basis of a case-by-case analysis by the competent authority. EIAs were performed for line 2 of the BRT and the reconstruction of Place Thiers as a part of the legal procedure for the design and approval of infrastructure projects in France (declaration of public interest). Both project components received a positive opinion from the corresponding competent authorities, including the environmental bodies, and were granted the necessary approvals for their implementation. A more detailed examination of all aspects relating to EU environmental directives, including the EIA Directive (2011/92/EU), the 'Habitats' Directive (92/43/EEC) and the 'Birds' Directive (79/409/EEC), will be performed during the final project appraisal.
    Despite some temporary disruption associated with the construction work (noise, vibration, traffic disruption, etc.) during the project's implementation, the project is expected to have a positive environmental impact overall thanks to the expansion of the public transport service.

    Passation des marchés

    The promoter - Communauté urbaine du Grand Nancy - is subject to and applies public procurement procedures according to the regulations of the European Union. The Bank will require the promoter to ensure that the contracts for the project's implementation have been/are attributed in accordance with the relevant legislation applicable to EU contracts (Directives 2004/18/EC or 2004/17/EC and 2007/66/EC) by publishing tender notices in the Official Journal of the European Union, if necessary. The procurement procedures followed/to be followed by the promoter are therefore appropriate for the project and satisfactory to the Bank.

    Statut

    Signé - 7/02/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Transports Aménagement urbain