Date de publication: 10 juin 2015
Promoteur – Intermédiaire Financier
URBASER SALieu
Description
The project concerns the financing of research, development and innovation in greenhouse-gas-reducing technologies for waste treatment, as well as investments in collection equipment.
Objectifs
The project aims to improve the operation and functioning of waste treatment, by developing and optimizing waste-treatment processing technology, in order to achieve greater efficiency and recovery of as many by-products as possible. The procurement of more efficient, quieter and less polluting waste collection vehicles will also increase productivity and reduce greenhouse gas emissions.
Secteur(s)
- Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 80 million
Coût total (montant approximatif)
EUR 186 million
Aspects environnementaux
The research, development and innovation (RDI) activities will be performed within existing facilities. It is unlikely that the project will fall under Annex I or II of Directive 2011/92/EC. Nevertheless, the environmental objectives of the RDI programme and, if needed, the CO2 footprint, as well as the possible impact on protected flora and fauna (Habitats 92/43/EEC and Birds 2009/147/EC Directives) will be assessed during the appraisal.
Passation des marchés
The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having a status of a contracting entity, thus not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 7/06/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).