Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110608
    Date de publication: 29 octobre 2012

    Promoteur – Intermédiaire Financier

    STORSTOCKHOLMS LOKALTRAFIK AB

    Lieu

    Description

    Replacement of the existing signalling system of the metro's Red Line with communications-based train control, associated upgrading of existing rolling stock and acquisition of new vehicles, construction of a new underground depot in Norsborg, and upgrading of the existing Nyboda depot in order to service the new and upgraded rolling stock.

    Objectifs

    The project will increase the public transport service by increasing the capacity of Stockholm’s underground. The project shall contribute to maintaining public transport competitiveness and attractiveness, thus preventing a modal shift towards private transport.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    SEK 5800 million (EUR 634 million)

    Coût total (montant approximatif)

    SEK 11655 million (EUR 1274 million)

    Aspects environnementaux

    The construction of the new depot falls under Annex II of the EU Environmental Impact Assessment (EIA) Directive, according to which the need for a full EIA is decided on a case-by-case analysis by the competent authority. The replacement of the signaling system and the upgrading of the existing depots also fall outside the scope of Directive 2011/92/EU. Compliance of project components, in particular of the new depot, with EU Directives on the environment, including the EIA Directive 2011/92/EU, the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC, will be analysed during appraisal. The question of the project falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with the EU Directive 2001/42/EC will also be examined during appraisal.

    Passation des marchés

    The promoter is subject to and follows public procurement rules according to EU regulations. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EEC, 2004/17/EEC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 15/02/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Transports