Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100264
    Date de publication: 21 juin 2010

    Promoteur – Intermédiaire Financier

    The Promoter is a public-private multi-utility which operates in the electricity, gas, district heating, solid waste and water sectors in the North of Italy.

    Lieu

    Description

    The proposed project reflects the 2010-2016 investment plan of the Promoter in the central part of the water management area of the Province of Brescia ( “ATO Brescia”). It includes:

    (i) expansion of the capacity of the Wastewater Treatment Plant (WWTP) of Verziano in Brescia;
    (ii) other investments in small and medium-sized infrastructures, of which ca. one third in the potable water treatment and distribution sector and two thirds in the wastewater collection and treatment sector.

    Objectifs

    By providing better wastewater services, the proposed project is expected to result in an improvement of the quality of the water bodies receiving the wastewaters in the area of Brescia. By achieving “ecological status of the water”, as well as through the rationalisation of wastewater and water supply services at the basin level, this project contributes toward implementing the requirements of the Water Framework Directive (2000/60EC).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 130 million.

    Coût total (montant approximatif)

    Up to EUR 260 million.

    Aspects environnementaux

    Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 97/11/EC, as amended by Directive 2003/35/EC, will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. Respect of the Habitats Directive 02/43/EEC will also be requested.

    Passation des marchés

    The Bank will require from the promoter that contracts for the implementation of the project have been or shall be tendered in accordance with relevant EU procurement laws (Dir 93/38, 2004/17/EEC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 30/09/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Eau, assainissement