Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20100264
    Veröffentlichungsdatum: 21 Juni 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    The Promoter is a public-private multi-utility which operates in the electricity, gas, district heating, solid waste and water sectors in the North of Italy.

    Ort

    Beschreibung

    The proposed project reflects the 2010-2016 investment plan of the Promoter in the central part of the water management area of the Province of Brescia ( “ATO Brescia”). It includes:

    (i) expansion of the capacity of the Wastewater Treatment Plant (WWTP) of Verziano in Brescia;
    (ii) other investments in small and medium-sized infrastructures, of which ca. one third in the potable water treatment and distribution sector and two thirds in the wastewater collection and treatment sector.

    Ziele

    By providing better wastewater services, the proposed project is expected to result in an improvement of the quality of the water bodies receiving the wastewaters in the area of Brescia. By achieving “ecological status of the water”, as well as through the rationalisation of wastewater and water supply services at the basin level, this project contributes toward implementing the requirements of the Water Framework Directive (2000/60EC).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 130 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Up to EUR 260 million.

    Umweltaspekte

    Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 97/11/EC, as amended by Directive 2003/35/EC, will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. Respect of the Habitats Directive 02/43/EEC will also be requested.

    Auftragsvergabe

    The Bank will require from the promoter that contracts for the implementation of the project have been or shall be tendered in accordance with relevant EU procurement laws (Dir 93/38, 2004/17/EEC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 30/09/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Wasser, Abwasser