    Référence: 20090366
    Date de publication: 19 août 2009

    Promoteur – Intermédiaire Financier

    Torresol Energy Investments

    Lieu

    Description

    The project concerns the construction and operation of 2 solar thermal power generation plants, each with a capacity of 50 MW and using molten salt storage technology; located near Cadiz (Andalusia / Spain).

    Objectifs

    The development of renewable energy will support EU and national targets for renewable energy generation and contribute to environmental and security of energy supply objectives. Electricity generation from concentrated solar power will displace fossil fuel-fired generation and the associated emissions of greenhouse gases and other emissions (SO2, NOx).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 330 million.

    Coût total (montant approximatif)

    Approximately up to EUR 660 million.

    Aspects environnementaux

    By virtue of its technical characteristics the project falls under Annex II of Directive 85/337/EC, as amended by 97/11/EC and 2003/35/EC, which leaves the requirement for an Environmental Impact Assessment (EIA) to be determined by the competent national authorities. In this case the Spanish authorities have required an EIA to be carried out. The outcome of the EIA procedure was favourable and the environmental authorisation was awarded in May 2009. Details of the environmental assessment procedures applied will be reviewed by the Bank during appraisal to verify compliance with the Bank’s environmental policy.

    Passation des marchés

    Neither the promoter nor the special purpose companies are subject to EU Procurement Directives. Suitable procurement procedures, including an appropriate selection of works, goods and services offered at competitive prices should be applied in the project’s best interests. Details will be verified during appraisal.

    Statut

    Signé - 21/07/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie