Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090267
    Date de publication: 25 août 2009

    Promoteur – Intermédiaire Financier

    Deere & Co

    Lieu

    Description

    The project concerns the promoter’s R&D investments in the field of engines and drivetrains efficiency, farming and harvesting technology, safety improvements of off-road mobile machinery cabins as well as GPS based precision farming.

    Objectifs

    The R&D activities include: development of enhanced tractor models in line with new emissions standards in order to improve the efficiency and reach a higher performance; design of efficient power transmissions, ergonomic cabins and use of alternative  energy sources; GPS applications. In the field of harvesting, enhancement of existing products and development of new products in order to improve productivity; development of new agricultural management systems. Concerning the production of engines, the objective is to improve existing engines in terms of efficiency, fuel consumption and emissions and to design new engines in order to meet the future emission standards.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 220 million.

    Coût total (montant approximatif)

    EUR 440 million.

    Aspects environnementaux

    The project concerns the continuation of current RDI practice and will be carried out within existing RDI facilities. An EIA should therefore not be required by EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, unless there are new premises to be built. The promoter will be required to assure that the provisions of the EIA Directive and those of any other relevant environmental requirements are complied with.

    Passation des marchés

    Procurement is expected to be in line with EIB guidelines for private sector projects. The Bank’s services will verify details during the project’s due diligence.

    Statut

    Signé - 21/07/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Allemagne Industrie