Date de publication: 4 novembre 2011
Promoteur – Intermédiaire Financier
Communauté d'Agglomération du Grand Besançon
Lieu
Description
The project consists of the construction of the first (14.5 km) tramway line and 31 stops in Greater Besançon and the rolling stock required to operate the line. The project also includes a maintenance centre and five park & ride facilities to encourage the modal shift from private cars to the tramway.
Objectifs
To reorganise urban mobility in the conurbation and have a significant impact on quality of life.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 75 million.
Coût total (montant approximatif)
Around EUR 250 million.
Aspects environnementaux
The project comes under Annex II to the amended Directive 85/337/EEC and so the need to conduct an environmental impact assessment (EIA) is determined by criteria laid down by the Member State. Under French law the project was subject to an impact assessment as part of the Declaration of Public Interest (DUP) procedure in June 2011. A more detailed analysis of all the environmental aspects will be carried out during the final appraisal of the project.
Passation des marchés
As a public inter-municipal cooperation entity, the Communauté d'Agglomération du Grand Besançon must comply with public procurement procedures under French law (the Public Procurement Code and Order of 6 June 2005) resulting from the transposition of Community directives (in particular Directive 2004/17/EC).
Statut
Signé - 31/08/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).