The project involves the construction of a 2.75 MW wind farm in the main island of Vanuatu (Efate).
Objectifs
The project will reduce the quantity of diesel fuel consumed by existing diesel generator units, thereby generating significant cost savings as well as avoiding the emission of CO2 and other polluting gases.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 4.30 million.
Coût total (montant approximatif)
EUR 5.72 million.
Aspects environnementaux
The overall environmental impact of this project is considered to be acceptable to the Bank.
Passation des marchés
The procurement procedures employed by the promoter are considered satisfactory to the Bank.
Statut
Signé - 20/10/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).