Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080035
    Date de publication: 15 janvier 2009

    Promoteur – Intermédiaire Financier

    Rijkswaterstaat Zuid-Holland, part of the Dutch Ministry of Transport, Public works and Water Management.

    Lieu

    Description

    The project involves the improvement of the road connection between the port of Rotterdam and its hinterland. It includes the widening and maintenance of 40 km of the A15 highway and the construction of 12 new structures and reconstruction of 36 associated structures under the terms of a 26 year DBFM contract.

    Objectifs

    The port of Rotterdam will be further expanded in the coming years. As a result, traffic is expected to increase further. In consultation with the Port of Rotterdam Authority, the project Promoter Rijkswaterstaat has identified that the A15 project is necessary to ensure sufficient access to the port for both long-haul and local traffic. In addition, the project will improve a current shipping bottleneck by increasing the clearance at the Botlekbridge.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 500 million.

    Coût total (montant approximatif)

    The total estimated project costs are up to EUR 2 billion. The final estimate will be known once the preferred bidder for the project has been appointed and contract negotiations completed.

    Aspects environnementaux

    The project falls under the requirements of Annex I of the EIA Directive 97/11/EC (amended by Directive 2003/35/EC), and has been subject of a full Environmental Impact Assessment, including public consultation. Detailed analysis of the EIA process and the project impact and mitigation measures will be performed during appraisal, including assessment of impact on Natura 2000 sites and compliance to Habitats and Birds Directives.

    Passation des marchés

    The project is being procured as a Public Private Partnership. The PPP contract will be awarded under the competitive dialogue procedure applicable to public works contracts under the EU Directive 2004/18/EC. Publication in the EU Journal has taken place on 19 December 2008.

    Statut

    Signé - 14/12/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Transports