    Référence: 20010343
    Date de publication: 16 septembre 2004

    Promoteur – Intermédiaire Financier

    Municipality of Budapest
    Office of the Mayor
    Attn. Mr. Attila PÓCS
    Counsellor, Head of Project Implementation Unit
    Városház u. 9 - 11H-1364  Budapest
    POB. 1
    Tel. +361 327 1066

    Lieu

    Description

    The project concerns the design, construction, operation and maintenance of the BCWWTP and ancillary investments. It includes the following main investments:

    • A new main sewer along the Buda side of the Danube River;
    • Upgrading and extension of three main pumping stations within the Budapest Central catchment area (Ferencváros, Kelenföld and Albertfalva pumping stations);
    • River crossings for wastewater mains from the Kelenföld and the Ferencváros pumping stations under the Danube River to the BCWWTP;
    • A waste water treatment plant with a capacity of 350.000 m3/day; and
    • A final sludge treatment and disposal system for the sludge produced at the BCWWTP.

    The project is scheduled to be implemented by the end of 2009.

    Objectifs

    The project represents a cost-effective solution to wastewater collection, treatment and sludge disposal in central Budapest to meet EU and Hungarian environmental standards. It is expected that there will be indirect benefits to the city through reduced pollution of the Danube and greater tourism potential of the riverfront.

    Commentaires

    Environment sector.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 147 million.

    Coût total (montant approximatif)

    Approximately EUR 529 million.

    Aspects environnementaux

    The project has been designed in full compliance with national and relevant EU environmental directives. Upon completion and successful start of operation wastewater generated by more than 90% of Budapest population (for the time being some 1.8 million) will be treated biologically.

    Passation des marchés

    Hungarian public procurement act to be applied (EU directives transposed into national law).

    Statut

    Signé - 18/07/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Eau, assainissement