Signature(s)
Fiche récapitulative
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
The project concerns Acqua Novara.VCO's 2025-2030 water and wastewater investment programme, aimed at improving system resilience through interconnections of the water distribution networks, new water sources, and leakage reduction as well as optimisation of existing sewerage treatment facilities.
The aim is to continue support the promoter's investments (e.g. water and wastewater treatment plants, networks and pumping stations) in the Piedmont region.
The Project is aligned to the InvestEU eligible area of water infrastructure as it supports investments in water and wastewater infrastructure by a local utility providing Integrated Water Services in the Piemonte Region, Italy. It ensures compliance with key European regulations in the water sector and improves the coverage and quality of water and wastewater services. The Project contributes to the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability.
It addresses a number of market failures through positive externalities in the form of environmental and public health benefits, notably improved resilience of water distribution systems against future droughts and reduced exposure to arsenic pollution and emerging pollutants such as PFAS. These benefits are not reflected in water tariffs and would not be realised to the same extent without public intervention.
Furthermore, the Project addresses a chronic investment gap in water services in Italy and provides long-term finance at attractive terms compared to commercial banking funding. EIB's participation as an anchor investor facilitates the crowding-in of other investors and positively impacts the utility stability and diversification of financing.
The EIB could not provide such type of financing support, or not to the same extent or at the same quantum, without support from the InvestEU guarantee.
The upgrade of water and wastewater infrastructure brings positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Wastewater Treatment Directive (91/271/EEC) and EU and national environmental legislation, notably under the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), Birds Directive (2009/147/EC) and Habitats Directive (92/43/EEC) will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation and sustainable use and protection of water and marine resources. This project also brings substantial health advantages and environmental quality improvements to the affected population, thereby increasing the quality of life in the project area. Social negative impacts are only temporary (e.g. occupation of public and private space, safety hazards during construction, traffic, noise) and will be addressed as part of the planning for the implementation of each scheme. As per social matters, the promoter will also be requested to comply with the relevant applicable legislation.
The promoter has to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
À la une
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes