Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    25 September 2024
    Status
    Reference
    Approved | 11/12/2024
    20230148
    Project name
    Promoter - financial intermediary
    LAO RESILIENCE NATIONAL ROAD 2
    MINISTRY OF PUBLIC WORKS AND TRANSPORT - LAO PEOPLE'S DEMOCRATIC REPUBLIC
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 40 million
    EUR 173 million
    Location
    Sector(s)
    Description
    Objectives

    This is the second allocation under "Framework Loan Lao Resilient Roads" to finance works aiming at improving Lao National Road 2 East (NR2E), from the Oudomxay Provincial centre to the Vietnam border, an important east-west corridor in South Asia linking Thailand-Laos-Vietnam (Asian Highway No. 13). With a total length of 295 km, NR2 consists of a West section (NR2W) (145 km) connecting with the Thai border at Huai Kone-Nam Ngeun and an East section (NR2E) (150 km) connecting with the Vietnamese border at Panghok-Tay Trang, Dien Bien Phu Province. In light of this, the Lao National Road 2 helps to achieve Lao PDR's aspiration to become a land-linked country through the development of economic corridors.

    The aim is to improve the climate resilience and strengthen the maintenance systems of NR2 by ensuring that road rehabilitation is done according to the latest climate resilience guidelines. The project is expected to bring a range of positive benefits to the local communities such as improved travel quality and reliability, increased access to social, educational and health care services, local market development of agricultural and business activities as well as more employment opportunities.

    Environmental aspects
    Procurement

    An Environmental and Social Management Framework has already been prepared for the project. In line with the requirements, having confirmed that the project does not require an environmental impact assessment (EIA), the Promoter has screened out the EIA and prepared two Initial Environmental Examination (IEE), which were both submitted to the Provincial Office of Natural Resources and Environment (PONRE) of Phongsaly and Oudomxay in 2023. The two IEEs were approved by the PONRE and the required Environmental Compliance Certificates (ECCs) were issued in February 2023. µ The IEE will be assessed during appraisal along with any impact on protected areas. The Promoter will be required to verify that all investments are carried out in line with the EIB Environmental & Social (E&S) standards. The road also forms part of a section of the Asian Highway No. 13 (AH13), which is one of the east-west corridors in Southeast Asia. The NR2E connects with the Vietnamese border at Panghok-Tay Trang, Dien Bien Phu Province and NR2W connects with Thailand border at Ban Pheng Ngam and Muang Ngeun. Thus, this project aims to improve the climate resilience of the NR2E and NR2W and will contribute to Climate Adaptation objectives of Lao government, the EIB and the EU.

    The project will be procured under an Output and Performance Based Road Contracts (OPBRC), with a 10-year contract life. The procurement plan for this project will include eight contracts, namely: two consultancy contracts for works supervision of approximately €3 million each (for NR2E and NR2W sections) and six works contracts (3 packages for NR2E and 3 Packages NR2W). EIB financing includes three contracts covering for two works contract packages for NR2E and supervision contract. The works supervision contract will be procured through an international competitive bidding procedure with pre-qualification (restricted tender procedure). The works contract will be procured through an international competitive bidding procedure (open procedure) with two envelopes. The Promoter has to ensure that implementation of the contracts financed by the EIB are done in accordance with the EIB's Guide to Procurement.

    Under ELM Guarantee

    This operation is covered by the ELM Guarantee.

    Milestone
    Approved
    11 December 2024
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Biodiversity Management Plan (BMP)
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235650221
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Labour Management Plan (LMP)
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235675309
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Resettlement Action Plan (RAP) - LAO RESILIENCE NATIONAL ROAD 2 - Resettlement Action Plan (RAP) for National Road No.2 – NR2W
    Publication Date
    31 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    235837416
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Environmental and Social Management Plan (ESMP) for National Road No.2 -NR2E
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235664113
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Environmental and Social Management Plan (ESMP) for National Road No.2 – NR2W
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235675307
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Resettlement Action Plan (RAP) - LAO RESILIENCE NATIONAL ROAD 2 - Resettlement Action Plan (RAP) for National Road No.2 East
    Publication Date
    31 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    235848626
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - LAO RESILIENCE NATIONAL ROAD 2
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235845601
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2
    Publication Date
    31 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    235836191
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Gender Action Plan (GAP)
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235663522
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - LAO RESILIENCE NATIONAL ROAD 2 - Ethnic Groups Engagement Plan (EGEP)
    Publication Date
    1 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    235691705
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - LAO RESILIENCE NATIONAL ROAD 2
    Publication Date
    11 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    176863239
    Document Focus
    Environmental Information
    Project Number
    20230148
    Sector(s)
    Publicly available
    Download now
    Link to source

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications