Amount (.*)
€ 39,725,000
Countries
Sector(s)
Palestine* : € 39,725,000
Water, sewerage : € 39,725,000
Signature date(s)
3/06/2025 : € 19,862,500
10/01/2024 : € 19,862,500
(*) Including a € 19,862,500 Investment Grants provided by the COMMISSION EUROPEENNE
Link to source

Summary sheet

Release date
27 September 2023
Status
Reference
Signed | 10/01/2024
20230080
Project name
Promoter - financial intermediary
NORTHEAST RAMALLAH WASTEWATER
PALESTINIAN WATER AUTHORITY - PALESTINIAN NATIONAL AUTHORITY
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 55 million
EUR 59 million
Location
Sector(s)
  • Water, sewerage - Water supply; sewerage, waste management and remediation activities
Description
Objectives

The project will enhance wastewater collection and treatment services in an area located northeast of Ramallah, in Palestine. In detail, it includes the following main components: (i) a new wastewater collection system for 14 villages/municipalities in the project area (ii) a new regional wastewater treatment plant in line with EU standards (iii) trunk lines leading to the wastewater treatment plant (iv) solar photovoltaic panels to contribute to the wastewater treatment plant energy needs (v) reuse scheme.

The aim is to improve the current services, since less than 20% of the population in the project area is connected to a sewage collection system. In addition, even where sewage is collected, no treatment is applied, with wastewater being discharged to wadis or open channels, hence contaminating both surface/ground water as well as soil.

Additionality and Impact

The project foresees the provision of a wastewater collection and treatment system for northeast Ramallah, in Palestine. Investments in sanitation infrastructure generate positive externalities through avoided pollution of the environment, surface and ground water. Therefore, the operation will bring substantial benefits to the population residing in the project area in terms of: (i) increasing access to safely managed sanitation services; (ii) environmental protection and depollution; (iii) improving public health, by protecting surface/underground water quality and reducing pollution; (iv) climate action thanks to wastewater reuse and sustainable water resources management in the context of water scarcity and the possible generation of renewable energy from solar PVs; (v) broadly speaking, promoting sustainable economic development, by contributing to the improvement of economic prospects and livelihoods of farmers in the area. Addressing these externalities and the resulting market failures thus contributes to achieving the EU, EIB's and national objectives of environmental protection and natural resource efficiency. Additionally, the project supports various sustainable development goals, in particular, but not limited to, contributing to clean water and sanitation, good health and wellbeing, and clean and affordable energy.

The long maturity of the EIB loan, its concessional financial terms with expected mobilization of a grant from the EU-Neighbourhood Investment Platform (EU NIP) are of high value to the Borrower and the project. Additionally, the long tenor, flexible terms of drawdowns adjusted to the needs of the project and advantageous financial terms will increase the financial flexibility and investment capacity. The Bank's contribution will therefore facilitate the completion of the project on favourable terms and in a timely manner.

Environmental aspects
Procurement

The project will have a positive impact through: (i) increased access to safely managed sanitation services for the local population (ii) environmental protection and depollution adaptation (iii) reduction of greenhouse gas emissions through energy savings due to optimised, state-of-the-art wastewater treatment processes as well as solar energy (iii) adaptation to climate change impacts by potentially providing water for re-use in irrigation from the treated effluent and (iv) improved environmental and public health. Inside the EU, the project components would be categorised under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU. The compliance with principles of relevant environmental EU legislation and EIB Environmental & Social Standards as well as climate change aspects will be further examined during appraisal.

The promoter (as an implementing agency) will have to follow the project procurement process according to the EIB's Guide to Procurement and the Palestinian Procurement Law.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Milestone
Under appraisal
Approved
Signed
15 November 2023
10 January 2024
Link to source
Other links

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - NORTHEAST RAMALLAH WASTEWATER - Feasibility Study Report
Publication Date
28 Sep 2023
Document language
Main Topic
Lending
Document Number
169428923
Document Focus
Environmental Information
Project Number
20230080
Sector(s)
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - NORTHEAST RAMALLAH WASTEWATER
Publication Date
17 Nov 2023
Document language
Main Topic
Lending
Document Number
171315622
Document Focus
Environmental Information
Project Number
20230080
Sector(s)
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications