Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    130 000 000 €
    Pays
    Secteur(s)
    Italie : 130 000 000 €
    Eau, assainissement : 130 000 000 €
    Date(s) de signature
    13/06/2023 : 130 000 000 €
    Lien vers la source
    Fiche technique

    Fiche récapitulative

    Date de publication
    14 novembre 2022
    Statut
    Référence
    Signed | 13/06/2023
    20220580
    Nom du projet
    Promoteur – Intermédiaire financier
    ACQUE WATER INVESTMENTS
    ACQUE SPA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 130 million
    EUR 281 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project concerns investments into water and wastewater infrastructure located in the Tuscany Region, notably in the Provinces of Firenze, Lucca, Pisa, Pistoia and Siena.

    The related investments - included in the business plan 2022-2025 - aim at rehabilitating, expanding and/or optimising: - Water mains, distribution networks and replacement of water meters - Sewer networks - Wastewater treatment plants - Other: SIG system, management software, remote control update

    Additionality and Impact

    The project will support investments in water and wastewater infrastructure in the Tuscany Region in Italy.


    It will ensure compliance with key European regulations in the water sector, and improve the quality and resilience of water and wastewater services. The project will contribute to the Bank's policy objectives of Sustainable Energy and Natural Resources, as well as horizontally to Climate Action and Environmental Sustainability.


    The project will address a number of market failures, including those associated with public goods, unaccounted for externalities and information failures, generating positive health and environmental benefits, which would not be realised to the same extent without public intervention. The project will also contribute to improving the efficiency of the potable water supply system while increasing its resilience against climate related risks. These benefits are not reflected in market prices and would not be realised to the same extent without public intervention.


    EIB intervention will allow the Borrower to lengthen the tenor of its debt and to contain the cost of funding, attracting other potential lenders.


    Aspects environnementaux
    Passation des marchés

    The the rehabilitation and strengthening of the water supply infrastructure (aqueduct), as well as the update and development of the waste water infrastructure (sewerage and purification), are in line with the EIB's Environmental Sustainability criteria and Climate Action. The Promoter undertakes not to allocate EIB funds to project schemes that require a full Environmental Impact Assessment (EIA) until the EIA and/or the necessary nature assessment have been finalised and approved by the relevant competent authority. Once any EIA is available, the Promoter will provide an electronic copy of its Non-Technical Summary (NTS) and full copy of the EIA, for publication on the EIB website. The Promoter shall not commit any EIB funds against any scheme that impacts nature conservation sites, without receiving from the relevant competent authorities the declaration under Art. 6(3) of the Habitats Directive that there are no significant effects and informing the Bank of such declaration having been obtained. Additionally, the Promoter undertakes to provide EIB, if requested, any decision and subsequent justification that screen out project schemes from the requirement of a full EIA as well as the decisions issued by the competent authorities regarding the Habitats and Birds Directives.

    The Promoter is a contracting authority falling under the provisions of the EU Public Procurement Directives. As such, they will be required to tender the contracts in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU and 2014/25/EU and Directives 89/665/EEC and 92/13/EEC), where applicable as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Unionq , as and where required, as transposed into Italian legislation. Under these conditions, the procurement procedures to be followed by the Promoter are suitable for the project and satisfactory to the EIB.

    Commentaires

    The Investment Plan will enable ACQUE to improve Non Revenue Water from 37% to 33% and extend the wastewater treatment capacity in 75 000 eq. pop.

    Milestone
    À l'examen
    Approuvé
    Signé
    14 décembre 2022
    13 juin 2023
    Projets associés
    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Évaluation des incidences environnementales et sociales - ACQUE WATER INVESTMENTS - Link to EIA report and Appropriate Assessment
    Date de publication
    6 déc. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    164958687
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220580
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Fiche technique sur les aspects sociaux et environnementaux - ACQUE WATER INVESTMENTS
    Date de publication
    29 nov. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    163118244
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220580
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes