Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    237 978 980,55 €
    Pays
    Secteur(s)
    Espagne : 237 978 980,55 €
    Énergie : 237 978 980,55 €
    Date(s) de signature
    22/07/2022 : 204 369,11 €
    22/07/2022 : 375 235,9 €
    22/07/2022 : 509 839,01 €
    22/07/2022 : 551 046,56 €
    22/07/2022 : 597 599,28 €
    22/07/2022 : 613 908,33 €
    22/07/2022 : 621 073,85 €
    22/07/2022 : 621 297,04 €
    22/07/2022 : 622 263,79 €
    22/07/2022 : 638 847,93 €
    22/07/2022 : 734 957,62 €
    22/07/2022 : 781 482,82 €
    22/07/2022 : 1 107 059,31 €
    22/07/2022 : 3 423 142,79 €
    22/07/2022 : 6 308 361,26 €
    22/07/2022 : 9 842 152,59 €
    22/07/2022 : 10 139 870,52 €
    22/07/2022 : 10 377 914,47 €
    22/07/2022 : 11 358 802,82 €
    22/07/2022 : 12 460 663,67 €
    22/07/2022 : 12 511 398,66 €
    22/07/2022 : 12 538 382,91 €
    22/07/2022 : 12 621 824,73 €
    22/07/2022 : 12 785 180,09 €
    22/07/2022 : 12 799 750,35 €
    22/07/2022 : 12 832 555,14 €
    14/06/2022 : 90 000 000 €
    Lien vers la source
    Fiche technique

    Fiche récapitulative

    Date de publication
    9 décembre 2021
    Statut
    Référence
    Signé | 14/06/2022
    20210428
    Nom du projet
    Promoteur – Intermédiaire financier
    HELIOS GREEN LOAN
    OPDENERGY HOLDING SA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 238 million
    EUR 497 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project consists of the development, design, construction and operation of 15 solar photovoltaic (PV) plants located across three regions of Spain (Aragon, Castilla La Mancha and Castilla y Leon), with a total installed capacity of approximately 685 MWp.

    The operation contributes to the EU-wide target of 32% of energy from renewable sources in gross final energy consumption for 2030 as set out in the latest EU RE Directive (Directive (EU) 2018/2001). It further contributes to the national renewable energy targets as laid out in Spain's Integrated National Energy and Climate Plan (NECP). The latter foresees for 2030 a national target of 42% renewable energy in the final energy consumption, which translates into a share of 74% in the electricity sector (relative to gross generation). The project is partly located in EIB Cohesion Priority Regions, as recently redefined in the context of the 2021-2027 MFF. The project is therefore partially eligible under Article 309 (a) projects for developing less-developed regions and fully under (c) common interest.

    Additionality and Impact

    The Project Helios concerns the financing of 13 solar photovoltaic power plants with an aggregated installed capacity of 605 MWp. The plants are located in Spain, specifically in the regions of Castilla La Mancha (4 plants of 206.5MWp in total), Aragón (9 plants / 398.5 MWp). 


    The Project increases renewable energy generation capacity in Spain and contributes to national and EU 2030 climate objectives. The financing of this Project is in line with the Bank's lending priority objectives on Renewable Energy as well as on Climate Action and Environmental Sustainability. The Project produces electricity from low carbon sources, addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and other air pollution (compared to fossil fuel generation). As the Project is expected to rely on revenues from the market (the wholesale market and unsubsidized commercial Power Purchase Agreements), in a sector characterised by incomplete markets (limited forward/hedging, lack of scarcity pricing and lack of locational pricing), the project improves market efficiency and competition. The Project has an excellent economic return when considering the economic value of the clean electricity generated. Some of the project components (33%) are located in EIB Cohesion Priority regions. The participation of the EIB is seen as pivotal both for its financial and non-financial contribution, in particular for securing a significant volume of financing at an adequate cost.


    OPDEnergy attaches great value added to the signaling effect provided by the EIB, as a reference financier with the strictest standards in terms of sustainability and environmental protection. Accordingly, OPDE deems EIB financing with a "Green Loan" label as a stamp of quality on its investments and environment-related procedures, which contributes to attract co-financiers.


    This document reflects the information presented at first stage approval for this operation. Therefore, the document does not take into account possible developments that could have occurred after this decision.

    Aspects environnementaux
    Passation des marchés

    This operation is intended to generate environmental benefits by supporting renewable energy projects that help mitigate climate change. The projects are expected to fall under Annex II of the EIA-Directive 2014/52/EU, amending 2011/92/EU, requiring the competent authorities to determine whether an environmental impact assessment (EIA) is required. Overhead transmission lines for the interconnection of the projects to the grid falling under the Annex I will be expected to be subject in all cases to an EIA process. At date, three out of 15 projects have obtained their environmental license (Declaracion de Impacto Ambiental, DIA), and the rest of the processes are still ongoing or under preparation. The Bank will assess the capacity and procedures of the Promoter to ensure the projects' compliance with the sector-relevant national and European environmental and biodiversity regulations. The authorisation procedure and compliance of the projects with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be further assessed during project appraisal, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites.

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - HELIOS GREEN LOAN
    Date de publication
    22 févr. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    151588143
    Thématique du document
    Information Environnementale
    Numéro du projet
    20210428
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes