Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Übersicht

Veröffentlichungsdatum
1 Juni 2021
Projektstatus
Referenz
Genehmigt | 17/11/2021
20200264
Projekttitel
Projektträger – Finanzintermediär
BUCHAREST GLINA II (FL 2015-0548)
MUNICIPALITY OF BUCHAREST
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 13 million
EUR 354 million
Ort
Sektor(en)
  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
Beschreibung
Ziele

Allocation under SPL Romania EU Co-financing for Environment 2014-20. The EIB will finance the State Contribution in the "Finalisation of Glina Waste Water Treatment Plant (WWTP), rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA)," in Bucharest. The project is the same as the operation 2012-0391.

Extension of Glina wastewater treatment plant, rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA), in order to have adequate treatment of the entire wastewater flow from the city complying with EU Directives, to reduce the level of infiltration rate in the sewer network and to have a sustainable solution for processing the entire sewage sludge production.

Additionality and Impact

The EIB will finance the State contribution in the "Finalisation of Glina Waste Water Treatment Plant (WWTP), rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA)", in Bucharest (Romania). The project is financed from the Cohesion Fund under the Large Infrastructure Operational Program (LIOP) 2014-2020.

The project will have significant environmental benefits, mainly through reduced pollution of surface waters. It will also reduce greenhouse gas emissions. The project will have substantial economic environmental benefits, reduced public health costs and improved socio-economic development to the persons in the project area (estimated population benefitting: about 2,000,000).

The project is expected to result in significant positive externalities in the form of environmental and public health benefits, and will also contribute to climate action. It is in line with the Bank's lending orientation for the water sector. The project is also in line with the European policy for the protection of the environment, in particular the objectives defined in the Water Framework Directive 2000/60/EC and the Urban Wastewater Treatment Directive 91/271/EC. The EIB contribution will help accelerate the investment by offering long-term financing at favorable conditions in comparison to the financial market, thus providing substantial value added. 


Umweltaspekte
Auftragsvergabe

The project is strongly environmentally driven and therefore has predominantly positive effects on the environment. The project was subject to environmental impact assessment (EIA) screening (screened in), and subsequently to the environmental impact assessment pursuant to Directive 2011/92/EC and respective national GD 445/2009. The Environmental Agreement was issued in 01/2013. The project is unlikely to have significant negative effects on the protected areas and sites.

The Bank will require the Borrower to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

Kommentar(e)

This allocation finances the State Contribution to this project. The Bank is also financing the local contribution through a loan to the Municipality of Bucharest.

Projekte zum thema
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Photogallery

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen