Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200264
    Veröffentlichungsdatum: 1 Juni 2021

    Projektträger – zwischengeschaltetes Finanzinstitut

    MUNICIPALITY OF BUCHAREST

    Ort

    Beschreibung

    Allocation under SPL Romania EU Co-financing for Environment 2014-20. The EIB will finance the State Contribution in the "Finalisation of Glina Waste Water Treatment Plant (WWTP), rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA)," in Bucharest. The project is the same as the operation 2012-0391.

    Ziele

    Extension of Glina wastewater treatment plant, rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA), in order to have adequate treatment of the entire wastewater flow from the city complying with EU Directives, to reduce the level of infiltration rate in the sewer network and to have a sustainable solution for processing the entire sewage sludge production.

    Kommentar(e)

    This allocation finances the State Contribution to this project. The Bank is also financing the local contribution through a loan to the Municipality of Bucharest.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 31 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 354 million

    Umweltaspekte

    The project is strongly environmentally driven and therefore has predominantly positive effects on the environment. The project was subject to environmental impact assessment (EIA) screening (screened in), and subsequently to the environmental impact assessment pursuant to Directive 2011/92/EC and respective national GD 445/2009. The Environmental Agreement was issued in 01/2013. The project is unlikely to have significant negative effects on the protected areas and sites.

    Auftragsvergabe

    The Bank will require the Borrower to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Projektstatus

    In Prüfung - 1/06/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Rumänien Wasser, Abwasser