Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Signature(s)

Amount
€ 60,000,000
Countries
Sector(s)
Belgium : € 60,000,000
Transport : € 60,000,000
Signature date(s)
18/10/2019 : € 60,000,000

Summary sheet

Release date
3 April 2019
Status
Reference
Signed | 18/10/2019
20170936
Project name
Promoter - financial intermediary
SOFICO - WALLOON WATERWAYS & ROADS MODERNISATION
SOCIETE WALLONNE DE FINANCEMENT COMPLEMENTAIRE DES INFRASTRUCTURES
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 200 million
EUR 599 million
Location
Sector(s)
Description
Objectives

The project, part of the SOFICO 2018-2022 Investment Programme, includes the renewal and enlargement of the Ampsin-Neuville inland waterway lock complex along the Meuse river as well as the improvement and resurfacing of various sectors of the E-411 and N5 roads in Wallonia, all of which are part of the Trans-European Transport Network (TEN-T) North Sea-Mediterranean Corridor.

The new lock complex will improve the navigation conditions on the Meuse which will be navigable for Class VIb convoys between Namur and Liège after the project is completed. This project component is the last part of an extensive investment plan executed over the past 10 years to upgrade this waterway section. The road rehabilitation projects on E411 and N5 are expected to improve safety and reduce vehicle operating costs. The capacity of the E411 will be expanded from four to six lanes over 16km which will bring time savings to the users.

Environmental aspects
Procurement

The project component "renewal of the lock complex at Ampsin-Neuville along the Meuse" falls under Annex I of the Environmental Impact Assessment (EIA) Directive, thus requiring a full EIA. Compliance of the overall project scope, with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC, the EIA Directive 2011/92/EU, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC (as amended) is required and will be checked in detail during the appraisal, as well as biodiversity assessment requirements, climate change adaptation issues, mitigation/compensation measures and environmental and social monitoring plans.

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/24/EU where applicable as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Non-Technical Summary (NTS) - SOFICO - WALLOON WATERWAYS & ROADS MODERNISATION - Ampsin-Neuville
Publication Date
12 Jul 2019
Document language
Main Topic
Lending
Document Number
94728619
Document Focus
Environmental Information
Project Number
20170936
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - SOFICO - WALLOON WATERWAYS & ROADS MODERNISATION - Etude d'Incidence - Ampsin-Neuville
Publication Date
12 Jul 2019
Document language
Main Topic
Lending
Document Number
94733131
Document Focus
Environmental Information
Project Number
20170936
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - SOFICO - WALLOON WATERWAYS & ROADS MODERNISATION
Publication Date
12 Jul 2019
Document language
Main Topic
Lending
Document Number
88016897
Document Focus
Environmental Information
Project Number
20170936
Sector(s)
Regions
Countries
Publicly available
Download now

Photogallery

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications