Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Summary sheet

Release date
9 May 2012
Status
Reference
Approved | 24/05/2012
20110026
Project name
Promoter - financial intermediary
ELECTRIFICATION ZABREH - SUMPERK
Ministry of Transport of the Czech Republic; Managing Authority of the Operational Programme of Transport in the Czech Republic
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
CZK 183 million (EUR 8 million)
CZK 1545 million (EUR 63 million)
Location
Sector(s)
Description
Objectives

The project consists of the renewal and electrification of the 13.46 km long single-track line between Zabreh and Sumperk. The project aims to integrate the railway line more closely into the regional network around Olomouc. The line speed is increased from 70 - 80 km/h to a maximum of 100 km/h. The loading capacity of the tracks is increased from UIC category D3 to category D4, which is common throughout much of Europe and allows for 22.5t/axle.

The main objective of the project is to modernise and electrify a feeder line to a TEN-T railway line between Prague and Prerov via Ceska Trebova and to improve the regional rail traffic operations North-East of Olomouc.

Environmental aspects
Procurement

Compliance with the EU directives relating to environmental protection was adequately addressed. The entire process of planning procedures, public enquiries and building permits has been respected. Based on a statement issued by the competent Authority, the project is not likely to have significant effects on Natura 2000 sites. Nevertheless, significant investment (6.3% of budget, approximately EUR 3.9 million) has been made for minimising or compensating negative environmental impacts.

EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The main contract was published in the OJEU under the reference number 2008/S 44-060738 on 4.3.2008. The procurement process is accountable under the Cohesion Funds regulations and is acceptable to the Bank.

Related projects
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications