Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20230656
    Release date: 30 November 2023

    Promoter – Financial Intermediary

    NEDERLANDSE WATERSCHAPSBANK NV

    Location

    Description

    The project concerns a multiple beneficiary intermediated loan (MBIL) with the second largest public sector bank in the Netherlands (NWB Bank) to finance small and medium scale projects promoted by the water authorities (SSPAs). Sub-projects will be investments in flood protection and water management.

    Objectives

    This will be the fourth operation with NWB Bank. The third loan was fully disbursed in 2022. Similarly to this one, the proposed loan will exclusively finance investments in the water sector, and the intended beneficiaries of the loan are water authorities in the Netherlands. The loan proceeds will be utilised during 2024-2026 to finance investments in flood defenses and water resource management, to ensure continued compliance with EU Directives and national guidelines.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 400 million

    Total cost (Approximate amount)

    not applicable

    Environmental aspects

    In accordance with the EIB's policy to ensure that sub-loans comply with the EU acquis, in particular in the fields of environment, the EIB will require NWB Bank to take all the requisite measures to ensure that the environment procedures carried out by the final beneficiaries for the sub-projects will comply with the relevant EU legislation and the applicable national legislation, provided that it is in conformity with EU rules.

    Procurement

    The intermediary institution will be required to take all the requisite measures to ensure that any procurement procedures carried out by the final beneficiaries for the sub-projects are in accordance with EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Status

    Signed - 26/01/2024

    Milestone
    Under appraisal
    Approved
    Signed
    19 December 2023
    26 January 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    The Netherlands Credit lines