Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20230123
    Release date: 6 September 2024

    Promoter – Financial Intermediary

    DEPARTEMENT DE L'EURE

    Location

    Description

    Framework loan for financing multi-sector investments as part of the sustainable development programme of the Department of Eure for the period 2024-2028.

    Objectives

    The project supports investment in public buildings, urban development, sustainable mobility and adaptation to climate change. This is expected to contribute to better balanced territorial development, reducing inequalities between people and between places. It will therefore improve living conditions in the department as well as strengthen socio-economic prosperity.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 100 million

    Total cost (Approximate amount)

    EUR 390 million

    Environmental aspects

    The Promoter will be required to act according to the provisions of the relevant EU Directives including, but not limited to, SEA (2001/42/EC), EIA (2011/92/EU amended by Directive 2014/52/EU), Habitats (92/43/EEC) and Birds (2009/147/EC) Directives and Water Framework Directive (2000/60/EC) as transposed into national law. The Bank will also assess the Promoter's compliance with the Energy performance of buildings directive (Directive EU/2018/844) at appraisal and during the allocation phase. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation.

    Procurement

    The Bank will require the promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Status

    Under appraisal - 3/10/2023

    Milestone
    Under appraisal

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    France Composite infrastructure