Referenz: 20190572
Veröffentlichungsdatum: 5 März 2020

Projektträger – zwischengeschaltetes Finanzinstitut

HAMBURGER STADTENTWAESSERUNG

Ort

Beschreibung

The project will finance the investment programme of Hamburg's wastewater company, including climate adaptation.

Ziele

The project concerns Hamburger Stadtentwässerung's investment programme for the period of 2020-2023 that will improve the efficiency and sustainability of wastewater services in Hamburg. It mainly consists of investments for the modernisation and upgrading of the central wastewater treatment plant. To a lesser extent, it concerns rehabilitation and upgrading of combined sewer systems (conveying both wastewater and storm water), in line with the Promoter's "Rain InfraStructure Adaptation plan" (RISA). The project will assist in maintaining compliance with the Water Framework Directive 2000/60/EC and the Urban Wastewater Treatment Directive 91/271/EC.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 160 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 430 million

Umweltaspekte

The project aims at maintaining compliance with the Water Framework Directive 2000/60/EC. Several of the construction schemes included in the project might fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. Environmental Impact Assessment procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. Where appropriate, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) are applied. The Bank's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives. All relevant key documents for the project will be published, in line with the Bank's disclosure policy.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 12/05/2020

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Wasser, Abwasser