Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20180038
    Release date: 26 April 2019

    Promoter – Financial Intermediary

    ABBANOA SPA

    Location

    Description

    The project consists of investments in water and waste water infrastructure in the Sardinia Region during the 2018 - 2022 period.

    Objectives

    The project is driven by the need to ensure compliance with the EU and national environmental legislation. The investments will deliver substantial health advantages and environmental quality improvements in the form of a more rational use of water resources, higher ecological quality of surface and groundwater resources, and increased service quality. Moreover, the project will contribute to climate change adaption and mitigation in a region increasingly affected by droughts.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities

    Proposed EIB finance (Approximate amount)

    EUR 200 million

    Total cost (Approximate amount)

    EUR 824 million

    Environmental aspects

    The investments in the water and wastewater sector are expected to have positive net environmental and social impact, considering their focus on compliance and resource efficiency. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Status

    Signed - 17/01/2019

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Italy Water, sewerage