    Reference: 20170912
    Release date: 23 September 2019

    Promoter – Financial Intermediary

    SOCIETE DE PATRIMOINE DES EAUX DU NIGER

    Location

    Description

    The project will finance the construction of a new drinking water treatment plant of Karey Gorou with a production capacity of 100 000 m3/day and related infrastructure (reservoirs, pipelines, pumping stations, connections) to adapt the existing water distribution system.

    Objectives

    The project will increase the water production capacity for the city of Niamey, to cope with the water demand until 2030, by enabling the delivery of the new volumes to a beneficiary population of about 2 million and will support the expansion of the city through over 25 000 new household connections. As a result, it will also improve the living conditions of the local population and thus contribute to reduce migration as an adaptation strategy of the population caused by water scarcity in the Sahel region, bringing a positive impact on public health and social stability.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Proposed EIB finance (Approximate amount)

    EUR 105 million

    Total cost (Approximate amount)

    EUR 220 million

    Environmental aspects

    Inside the EU, the project components would be categorised under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU and therefore would be subject to environmental screening to define if an EIA would be required according to the relevant competent authority. An EIA will be required for the project. The Bank will assess the environmental and social aspects of the project during appraisal to ensure adherence to its social standards. Climate change aspects will be further examined during appraisal.

    Procurement

    The promoter will have to ensure that implementation of the project in line with EIB's Guide to Procurement.

    Status

    Signed - 18/12/2019

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Niger Water, sewerage