    Reference: 20120407
    Release date: 15 May 2015

    Promoter – Financial Intermediary

    PUBLIC ENTITY(IES)

    Location

    Description

    This project comprises the construction of high voltage transmission infrastructure required to evacuate electricity from newly-constructed hydropower plants in the Trishuli River basin into the national grid, as well as a rural electrification component to supply power to communities in the vicinity of the project areas. The project also includes an upgrade of the national Load Dispatch Centre (LDC).

    Objectives

    The project will deliver new supplies of hydroelectricity to meet increasing demand in Kathmandu and the rest of Nepal. As such, it will address the shortage of power in the Nepalese grid as well as the efficient integration of new generation capacity from renewable sources (hydropower).

    Comments

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 30 million

    Total cost (Approximate amount)

    EUR 65 million

    Environmental aspects

    The promoter has conducted initial environmental examinations that indicate that the impacts of the main project components are moderate, within acceptable limits and can generally be mitigated. The majority of the land required for the transmission line will be available for cultivation after completion. A limited number of households will be affected, and no existing residences will require relocation. Detailed environmental & social management and land acquisition & compensation plans will be prepared prior to the start of any construction activities. The Bank will ensure that appropriate measures are taken to protect the environment and the rights of people affected by the project, and to avoid, reduce, mitigate and compensate for the impacts.

    Procurement

    The Bank will require the promoter to ensure that implementation of the project is carried out in accordance with the Bank's Guide to Procurement as applicable to operations in the public sector.

    Status

    Signed - 3/12/2015

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Nepal Energy