Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 426,082,716.64
    Countries
    Sector(s)
    United Kingdom : € 426,082,716.64
    Energy : € 426,082,716.64
    Signature date(s)
    27/03/2013 : € 173,812,282.74
    7/08/2014 : € 252,270,433.9

    Summary sheet

    Release date
    10 July 2012
    Status
    Reference
    Signed | 27/03/2013
    20100003
    Project name
    Promoter - financial intermediary
    SHE TRANSMISSION UPGRADE - RENEWABLES
    Scottish Hydro Electric Transmission Limited
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 434 million (GBP 350 million)
    EUR 906 million (GBP 731 million)
    Location
    Sector(s)
    Description
    Objectives

    Reinforcement and extension of the high voltage electricity transmission system in Scotland to allow for the connection of renewable generation assets.

    This is an investment programme aimed at reinforcing and extending the transmission network of the promoter in Scotland, the main purpose being to facilitate the connection and transmission of renewable generation and improve network reliability. The programme comprises 3 transmission line components (approximate aggregate length 550km) and associated substation components comprising new switchgear and additional transformer capacity

    Environmental aspects
    Procurement

    Considering their technical characteristics, project components fall under either Annex I or Annex II of the EIA Directive. The impacts that can be typically expected for these components relate to visual impact, vegetation clearance, bird strikes and mortality, electromagnetic fields, noise nuisance, disturbance during construction and impact on fauna and flora. Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - SHE TRANSMISSION UPGRADE - RENEWABLES
    Publication Date
    22 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65999497
    Document Focus
    Environmental Information
    Project Number
    20100003
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - SHE TRANSMISSION UPGRADE - RENEWABLES
    Publication Date
    6 Oct 2017
    Document language
    Main Topic
    Lending
    Document Number
    76738935
    Document Focus
    Environmental Information
    Project Number
    20100003
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications