Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20090362
Release date: 27 July 2009

Promoter – Financial Intermediary

Aquafin NV

Location

Description

The project comprises schemes for the construction of collector sewers, storm overflows and small and medium size wastewater treatment plants, plus some upgrading of existing waste water treatment plants for tertiary treatment in the Flemish Region.

Objectives

N/A

Sector(s)

Proposed EIB finance (Approximate amount)

Approx. EUR 200 million.

Total cost (Approximate amount)

Approx. EUR 440.20 million.

Environmental aspects

The investment programme will improve aquatic environmental conditions throughout the Flemish Region. The entire Flemish Region has been declared as sensitive and therefore tertiary treatment will be provided at all medium and large WWTPs. Although Belgium as a whole is lagging in compliance with EC Directives, Flanders has made good progress to fully meet the requirements of the Urban Waste Water Treatment Directive 91/271/EC.

EIA Directive 97/11/EC has been transposed into Flemish Law as Decreet VI. Reg18/12/02, Besl. VI. Reg. 10/12/04. Aquafin has a good environmental awareness and has developed operating procedures to optimise the performance and cost-effectiveness of its systems. Aquafin has full ISO14001 accreditation for its EIA procedures and fully complies with Natura 2000, European Bird and Habitat Directives. Some projects, i.e. all the WWTPs will fall either under Annex 1 or Annex 2 of the EIA directive. Aquafin will be requested to provide timely information available to the Bank about its compliance with producing either the EIA or the respective EIS.

Procurement

The program falls under the Procurement Directive 2004/18/EC. Although the promoter formally operates as a private company, tender procedures are required to comply with the EC public procurement Directives, which have been institutionalised. This is acceptable to the Bank.

Status

Signed - 11/12/2009

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Belgium Water, sewerage