Search En menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20080331
Release date: 7 October 2008

Promoter – Financial Intermediary

Petrom SA.

Location

Description

The project includes design, manufacturing, construction and operation of the Combined Cycle Gas Turbine (CCGT) Power Plant in the vicinity of Ploiesti, Romania. The plant will comprise two gas and one steam turbine of total capacity of 860 MWe. The project comprises also 3 km electrical overhead line and 30 km gas pipeline.

Objectives

The project contributes to the Bank’s priority lending objective “developing or rationalising economic activity, addressing Europe’s intensive use of traditional energy sources” and “diversification and security of internal supply”.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 200 million.

Total cost (Approximate amount)

EUR 557 million.

Environmental aspects

The project falls under Annex 1 of the Environmental Impact Assessment (EIA) Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment. The developed EIA study concluded that plants’ emissions to the air and its impact on soil, biodiversity and human beings are acceptable if requested mitigation actions are undertaken by the promoter. The CCGT plant’s specific CO2 emissions are below average specific emissions in Romanian electricity generation system.

Procurement

The project is not subject to public procurement requirements. During the appraisal the Bank will verify the promoter’s procurement procedures to ensure that the project benefits from market-based competition between potential subcontractors.

Status

Signed - 8/05/2009

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Romania Energy