    Reference: 20060516
    Release date: 19 March 2007

    Promoter – Financial Intermediary

    ÖBB-Infrastruktur Bau AG

    Location

    Description

    The project relates to the construction of two additional tracks on the Priority TEN mainline railway between Vienna and St. Pölten (Westbahn). The total length of this four-track railway line section is 44km, including the 13km Wienerwaldtunnel and additional 6 shorter tunnels.

    Objectives

    The project will add capacity, operational flexibility and thus reliability, allow faster train operation and improve comfort.

    Comments

    Priority TENs, sustainable transport

    Sector(s)

    Proposed EIB finance (Approximate amount)

    About EUR 400 million.

    Total cost (Approximate amount)

    About EUR 1.45 billion.

    Environmental aspects

    The project would fall under Annex I of EU Directive 97/11/CE. Compliance with the respective requirements will be verified during appraisal.

    Procurement

    Compliance with the national and EU procurement legislation will be verified during appraisal.

    Status

    Signed - 6/09/2007

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Austria Transport