Reference: 20040004
Release date: 29 January 2009

Promoter – Financial Intermediary

RAVE, S.A.

Location

Description

The project involves the construction, as part of a 40 year Design, Build Finance and Maintain (DBFM) contract, of (i) 176 km of double track high speed rail line between Poceirão, 40 km east of Lisbon, and Caia on the Portuguese/Spanish border as well as (ii) 92 km of single track conventional line between Evora and Caia. The project forms part of two priority TEN-T projects.

Objectives

To promote regional development. To improve the connection between Portugal and Spain. To reduce travel times and vehicles operating cost, and enhance safety.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to EUR 600 million.

Total cost (Approximate amount)

Currently estimated at EUR 1550 million.

Environmental aspects

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC, and hence requires a full EIA. The possible application of Directive 2001/42/CE on Strategic Environmental Impact Assessment is to be assessed during appraisal. The Habitats Directive will apply as the line will cross in particular the Natura 2000 site of Caia, close to the border with Spain. The application of the Birds Directive and potential trans-boundary impacts, including consultations and agreements on mitigants, are to be assessed. The project may impact other existing or proposed protected sites. This, along with a review of the EIA process more generally, is to be assessed during appraisal.

Procurement

An open call for initial tenders was made in the OJEU and Diário da República on June 2, 2008. Four initial offers were received on October 2, 2008. Two bidders were selected to enter into parallel negotiations with the public promoter prior to submission of Best and Final Offer.

Status

Signed - 8/05/2010

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Portugal Transport