Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20030061
    Release date: 21 March 2003

    Promoter – Financial Intermediary

    London & Continental Railways Limited
    3rd Floor
    183 Eversholt Street
    GB - London NW1 1AY
    Contact : Mr. Mark Bayley, Group Treasurer

    Location

    Description

    The Channel Tunnel Rail Link (CTRL) is a high speed railway line between the Channel Tunnel and London. It forms part of the PBKAL network, which comprises high speed railway lines linking Paris-Brussels-Köln-Amsterdam-London. Section 1 (between the Channel Tunnel and Fawkham Junction in Kent) is expected to open in the 4th quarter of 2003. Section 2, the subject of the current project, comprises construction of the remaining route between Fawkham Junction and St. Pancras station in London. Construction of Section 2 began in July 2001, and progress is satisfactory with tunnel boring and other major civil works well under way. Completion is scheduled for early 2007.

    Objectives

    CTRL will reduce journey times between London and Paris/Brussels by around 30 minutes compared to today, improving the competitiveness of rail relative to air and road transport and forming an integral part of the European high-speed passenger rail network. CTRL will also provide substantial capacity for high speed domestic services between London and Kent, and will release capacity on existing lines for freight and regional passenger services. The new section will contribute to urban regeneration in the East London and East Thames areas through a large scale redevelopment of redundant rail lands centred on the new station at Stratford and around St. Pancras. The construction cost of the current redevelopment plans are similar in magnitude to the GBP 5.2 billion target cost of the entire CTRL project (Sections 1 and 2).

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to GBP 300million

    Total cost (Approximate amount)

    The target cost of Section 2 is approximately GBP 3.3 billion from the start of construction.

    Environmental aspects

    The project falls within the scope of Annex I of Directive 97/11. However the Directive allows exemption from the formal procedures if the project details are adopted by a specific act of national legislation. This is the case for this project where the CTRL Hybrid Bill has completed the parliamentary procedures, which included extensive public consultations as part of the Select Committee process.

    Procurement

    The promoter follows the procedures required by the EU Directive and has advertised all contracts in the Official Journal of the EU.

    Status

    Signed - 30/06/2003

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    United Kingdom Transport