Search En menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20020639
Release date: 14 July 2004

Promoter – Financial Intermediary

Gestor de Infraestructuras Ferroviarias (GIF).

Location

Description

The project consists of the construction of the high-speed rail infrastructure between Cordoba and Malaga, both located in the Region of Andalucia (objective 1 area).

Objectives

The project is a priority TEN and a key component of the Spanish high-speed rail network. The new line will connect with the existing high speed line from Seville to Madrid, and from there to Barcelona and France, thus providing interoperability with the European rail network.

Comments

Rail.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to 50% of the total project cost.

Total cost (Approximate amount)

Around EUR 2000 million.

Environmental aspects

Compliance with EU environmental directives and national laws shall be ensured.

Procurement

Compliant with EU Directives.

Status

Signed - 29/11/2005

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Spain Transport