Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20010343
    Release date: 16 September 2004

    Promoter – Financial Intermediary

    Municipality of Budapest
    Office of the Mayor
    Attn. Mr. Attila PÓCS
    Counsellor, Head of Project Implementation Unit
    Városház u. 9 - 11H-1364  Budapest
    POB. 1
    Tel. +361 327 1066

    Location

    Description

    The project concerns the design, construction, operation and maintenance of the BCWWTP and ancillary investments. It includes the following main investments:

    • A new main sewer along the Buda side of the Danube River;
    • Upgrading and extension of three main pumping stations within the Budapest Central catchment area (Ferencváros, Kelenföld and Albertfalva pumping stations);
    • River crossings for wastewater mains from the Kelenföld and the Ferencváros pumping stations under the Danube River to the BCWWTP;
    • A waste water treatment plant with a capacity of 350.000 m3/day; and
    • A final sludge treatment and disposal system for the sludge produced at the BCWWTP.

    The project is scheduled to be implemented by the end of 2009.

    Objectives

    The project represents a cost-effective solution to wastewater collection, treatment and sludge disposal in central Budapest to meet EU and Hungarian environmental standards. It is expected that there will be indirect benefits to the city through reduced pollution of the Danube and greater tourism potential of the riverfront.

    Comments

    Environment sector.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 147 million.

    Total cost (Approximate amount)

    Approximately EUR 529 million.

    Environmental aspects

    The project has been designed in full compliance with national and relevant EU environmental directives. Upon completion and successful start of operation wastewater generated by more than 90% of Budapest population (for the time being some 1.8 million) will be treated biologically.

    Procurement

    Hungarian public procurement act to be applied (EU directives transposed into national law).

    Status

    Signed - 18/07/2005

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Hungary Water, sewerage