Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 19990291
    Release date: 28 September 2004

    Promoter – Financial Intermediary

    Road and Motorway Directorate
    Na Pankràci 56
    P.O. BPX 1
    145 05 Praha 4
    Czech Republic
    Attn. Petr Lausman, General Director

    Location

    Description

    Construction of two sections (807/I and 807/II) on the motorway from Prague to the Northern border with Germany (D8), for a total length of 23 km. The project has design speeds of up to 120 km/h and includes several bridges, interchanges, a service area, as well as two tunnels (Libouchec and Panenska).

    Objectives

    The project will eliminate the final missing motorway link between Prague and Dresden and is therefore a top priority on the Czech and German alignments of the pan European corridor IV linking Berlin to Istanbul. The new sections will benefit also from a EUR 62 mil (approx. CZK 1.9 bn) grant from the EU regional funds (ISPA). On the German side, the motorway will be completed by the A17 from the border to Dresden. This project is also being supported by the EU Structural Funds allocated to Germany.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    CZK 12 bn (approximately EUR 400 m).

    Total cost (Approximate amount)

    CZK 21 bn (approximately EUR 700 m).

    Environmental aspects

    The project has been subject to a full Environmental Impact Assessment. The cross-border facilities are built according to an intergovernmental agreement between the Czech Republic and Germany. Common environmental mitigation measures have been applied on both sides of the border on the D8 and the A17.

    Procurement

    All work and service contracts financed by the Bank are advertised in the Official Journal of the EU. ISPA-Cohesion Fund procedures apply to sections supported by EU grants.

    Status

    Signed - 23/09/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Czech Republic Transport