Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
16 mai 2025
Statut
Référence
À l'examen | 22/04/2025
20250247
Nom du projet
Promoteur – Intermédiaire financier
PROJECT SOPHOCLES SOLAR AND BATTERY GREEN LOAN
SUNPRIME HOLDINGS SRL
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 226 million
EUR 487 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The loan will finance a multi-year investment programme in small-scale solar photovoltaic plants (PV), across multiple sites in Italy. The PV plants total approximately 280 MWp, combined with 80 MW (4-hour) battery energy storage systems (BESS), and an additional 270 MW (4-hour) of standalone BESS.

The aim is to produce and store electricity from low-carbon sources, PV and BESS plants. As such, the project addresses the market failure of under-investment in clean energy generation due to the non-internalisation of the climate and environmental externalities. The project also supports EU Renewable Energy objectives and supports Italy in meeting its commitments with respect to renewable energy (RE) targets (65% RE by 2030) and greenhouse gas emission reductions, set out in the Integrated National Energy and Climate Plan (INECP) revised after the publication of the EU Green Deal. Solar PV plants contribute to the progression of the national and EU energy and climate goals, namely decarbonising electricity production in the EU and decreasing the reliance on fossil fuels. The project is therefore eligible under Article 309 point (c) common interest. Furthermore, certain regions where the portfolio of plants will be developed are classified as EIB Cohesion Priority Regions, thus contributing to developing less-developed regions. The investment programme is expected to be economically justified, as it will generate economic benefits, notably in terms of climate action, by stepping up investments in renewable energy, the creation of economic activity, as well as CO2 emission reductions.

Aspects environnementaux
Passation des marchés

This investment programme will generate environmental benefits by supporting both rooftop and ground based solar PV and BESS projects that help mitigate climate change. The solar PV and BESS plants fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which Member States shall determine whether the installation should be subject to a mandatory EIA based on defined criteria. Impacts on the environment from Solar PV and BESS plants typically stem from noise, dust, and increased traffic during the construction phase as well as visual and land use impacts during operation. These impacts are unlikely to cause any significant negative residual effects to the environment.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. The solar PV and BESS plants will likely be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and subsequent 2014/25/EU, hence private sector procurement procedures are expected to apply. Equipment and works may be purchased through a single Engineering, Procurement, and Construction contract or through several separate contracts. In the case that the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the European Commission will be duly informed, which will require the promoter to apply those rules.

Milestone
À l'examen
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes