Veröffentlichungsdatum
16 Mai 2025
Projektstatus
Referenz
In Prüfung | 22/04/2025
20250247
Projekttitel
Projektträger – Finanzintermediär
PROJECT SOPHOCLES SOLAR AND BATTERY GREEN LOAN
SUNPRIME HOLDINGS SRL
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 226 million
EUR 487 million
Ort
Sektor(en)
Beschreibung
Ziele

The loan will finance a multi-year investment programme in small-scale solar photovoltaic plants (PV), across multiple sites in Italy. The PV plants total approximately 280 MWp, combined with 80 MW (4-hour) battery energy storage systems (BESS), and an additional 270 MW (4-hour) of standalone BESS.

The aim is to produce and store electricity from low-carbon sources, PV and BESS plants. As such, the project addresses the market failure of under-investment in clean energy generation due to the non-internalisation of the climate and environmental externalities. The project also supports EU Renewable Energy objectives and supports Italy in meeting its commitments with respect to renewable energy (RE) targets (65% RE by 2030) and greenhouse gas emission reductions, set out in the Integrated National Energy and Climate Plan (INECP) revised after the publication of the EU Green Deal. Solar PV plants contribute to the progression of the national and EU energy and climate goals, namely decarbonising electricity production in the EU and decreasing the reliance on fossil fuels. The project is therefore eligible under Article 309 point (c) common interest. Furthermore, certain regions where the portfolio of plants will be developed are classified as EIB Cohesion Priority Regions, thus contributing to developing less-developed regions. The investment programme is expected to be economically justified, as it will generate economic benefits, notably in terms of climate action, by stepping up investments in renewable energy, the creation of economic activity, as well as CO2 emission reductions.

Umweltaspekte
Auftragsvergabe

This investment programme will generate environmental benefits by supporting both rooftop and ground based solar PV and BESS projects that help mitigate climate change. The solar PV and BESS plants fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which Member States shall determine whether the installation should be subject to a mandatory EIA based on defined criteria. Impacts on the environment from Solar PV and BESS plants typically stem from noise, dust, and increased traffic during the construction phase as well as visual and land use impacts during operation. These impacts are unlikely to cause any significant negative residual effects to the environment.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. The solar PV and BESS plants will likely be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and subsequent 2014/25/EU, hence private sector procurement procedures are expected to apply. Equipment and works may be purchased through a single Engineering, Procurement, and Construction contract or through several separate contracts. In the case that the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the European Commission will be duly informed, which will require the promoter to apply those rules.

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen