Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    28 April 2025
    Status
    Reference
    Approved | 24/07/2025
    20240575
    Project name
    Promoter - financial intermediary
    INLAND PORT OF BOGOJEVO
    REPUBLIC OF SERBIA - MINISTRY OF CONSTRUCTION, TRANSPORT AND INFRASTRUCTURE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 32 million
    EUR 65 million
    Location
    Sector(s)
    Description
    Objectives

    The project concerns the rehabilitation and expansion of the inland port of Bogojevo along the Danube River. It includes investments in quay side and terminal infrastructure and the scheme is part of the Serbian Inland Waterway Infrastructure framework loan.

    The project is a major scheme under framework loan 2017-0671 SERBIAN INLAND WATERWAYS INFRASTRUCTURE. The project expands the cargo handling capacity of an inland waterway port along the Danube, which is a waterway on the Trans-European Transport Network (TEN-T) on the Rhine-Danube Inland Waterway corridor. The rehabilitation of the Port of Bogojevo foresees works for the construction of a new operational quay, administrative buildings, construction of traffic, electricity, telecommunications, thermal power and hydraulic engineering infrastructure for the port functioning, construction of the port infrastructure of the planned port terminals, as well as providing supervision services during the construction. The port is 40 km distance from the E75 highway (Belgrade-Budapest) and it will be connected to the national railway network. The port sits by a bridge connecting Serbia and Croatia. The promoter is the Ministry of Construction, Transport and Infrastructure of the Republic of Serbia.

    Environmental aspects
    Procurement

    If within the EU, the project would fall under Annex I of the EIA Directive 2014/52/EU of 16 April 2014 amending Directive 2011/92/EU on the assessment of the effects of certain public and private Projects on the environment. An environmental and social impact assessment of the Detailed Spatial Regulation Plan of the Port of Bogojevo was prepared. It received approval via Granting Consent No. 501-11/21-05 of 24 March 2021.

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Milestone
    Approved
    24 July 2025
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - INLAND PORT OF BOGOJEVO
    Publication Date
    15 Aug 2025
    Document language
    Main Topic
    Lending
    Document Number
    249173760
    Document Focus
    Environmental Information
    Project Number
    20240575
    Sector(s)
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications