Summary sheet

Release date
17 September 2024
Status
Reference
Approved | 28/01/2025
20240167
Project name
Promoter - financial intermediary
PROJECT EMILI - IMERYS DEMO-PLANT
IMERYS SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 61 million
EUR 123 million
Location
Sector(s)
Description
Objectives

The project concerns the construction of two demonstration plants located in central France for the production of battery grade lithium hydroxide monohydrate. The concentrator demonstration plant will be located at the mine site near Echassières and the conversion demonstration plant will be located in an industrial park near Montluçon. The project will not produce commercial quantities of material.

The demonstration plants are designed to prove the selected technology, allowing the promoter to de-risk the future commercial plants by identifying issues and reducing the time to ramp-up the technology. Additionally, the demonstration plants will provide the opportunity to train the operations teams leading to an acceleration in the ramp-up in production rate and reducing the time to bring the product to the market. The project and subsequent commercial plants address the growing demand for lithium for battery applications in the EU and aligns with the goals of the green transition, particularly the decarbonisation of the transport sector.

Environmental aspects
Procurement

The two demonstration plants, considered as part of the planned full-size project, Article R. 122-2 of the French Environmental Code require a systematic environmental assessment, equivalent to requirements under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by 2014/52/EU, necessitating an EIA. The plants will require a permit under ICPE (Installation Classée pour la Protection de l'Environnement). ICPE incorporates the requirements of the EIA Directive into French law including the requirement for an EIA. The EIA assessment must encompass all operations (across all sites) and all phases (pilot, construction, and commercial). The IED (Industrial Emissions Directive) does not apply to these demonstration plants as they are considered Research and Development Units. A shaft of approximately 1 km in length will be excavated in the existing mine site to provide material for the demonstration plants and considered as an associated works.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

Milestone
Under appraisal
Approved
28 January 2025
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - PROJECT EMILI - IMERYS DEMO- - Etape Pilote - Etude d'Impact - Tome 2B
Publication Date
4 Dec 2024
Document language
Main Topic
Lending
Document Number
238180872
Document Focus
Environmental Information
Project Number
20240167
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - PROJECT EMILI - IMERYS DEMO-PLANT - Etape pilote - Etude d'Impact - Résumé Non Technnique
Publication Date
5 Dec 2024
Document language
Main Topic
Lending
Document Number
227093112
Document Focus
Environmental Information
Project Number
20240167
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - PROJECT EMILI - IMERYS DEMO-PLANT
Publication Date
30 Jan 2025
Document language
Main Topic
Lending
Document Number
224879827
Document Focus
Environmental Information
Project Number
20240167
Sector(s)
Regions
Countries
Publicly available
Download now
Other links

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications