    Summary sheet

    Release date
    14 January 2026
    Status
    Reference
    Approved | 25/03/2026
    20240006
    Project name
    Promoter - financial intermediary
    POTPEC HPP RECONSTRUCTION AND CAPACITY EXPANSION
    JSC ELEKTROPRIVREDA SRBIJE BELGRADE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 76 million
    EUR 91 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The operation is an allocation under a signed Framework Loan for Green Financing by EPS (Elektroprivreda Srbije) for the reconstruction of three existing power units and the construction of a new 13 MW power unit at the Potpec Hydropower Plant (HPP).

    The aim of rehabilitating the existing units is to extend their operational lifetime, reduce maintenance costs, and increase efficiency. The construction of the new unit aims to compensate for lost production during the rehabilitation of the existing units and to utilise overflowing water. Together, the rehabilitation and construction activities are expected to increase average annual electricity generation from 213 GWh to 236.7 GWh.

    Environmental aspects
    Procurement

    The Environmental Impact Assessment (EIA) process and public consultation for the Potpec Hydropower Plant rehabilitation and capacity expansion were successfully completed, and the corresponding environmental consent was issued by the competent authority (Ministry of Environmental Protection) in 2018. As project implementation did not commence within two years (2020), the consent expired. Upon the promoter's application, the Ministry re-issued the environmental consent in July 2024, confirming that no new or updated EIA is required, that the expired EIA remains valid, and that all defined mitigation measures must be applied. The EIA report will be reviewed during appraisal to ensure compliance with EIB's environmental standards. The project is expected to contribute to climate action and environmental sustainability objectives, particularly in terms of climate change mitigation.

    The Promoter shall ensure that tender procedure will be done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Comments

    This project is expected to benefit from a grant contribution of up to EUR 15.24 million under the Western Balkans Investment Framework (WBIF), supporting its preparation and implementation.

    Milestone
    Approved
    25 March 2026
    Related projects
    Parent project

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental Impact Assessment - POTPEC HPP RECONSTRUCTION AND CAPACITY EXPANSION - Studija o proceni uticaja na životnu sredinu
    Publication Date
    24 Jan 2026
    Document language
    Main Topic
    Lending
    Document Number
    258548799
    Document Focus
    Environmental Information
    Project Number
    20240006
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - POTPEC HPP RECONSTRUCTION AND CAPACITY EXPANSION
    Publication Date
    28 Mar 2026
    Document language
    Main Topic
    Lending
    Document Number
    246787993
    Document Focus
    Environmental Information
    Project Number
    20240006
    Sector(s)
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications