« La production de chaleur est l’un des plus grands défis de la transition énergétique en Europe, car c’est elle qui consomme le plus d’énergie et produit le plus de dioxyde de carbone. »
Fiche récapitulative
The project represents the first commercial scale implementation of an innovative closed loop geothermal technology to generate baseload combined heat and power, through heat conduction transfer between rocks in the subsurface and a wellbore-isolated cycling fluid. This is expected to progress the feasibility, competitiveness and scalability of the technology by demonstrating its application to diverse geological settings, with the potential to be applied to a wider range of locations compared to conventional geothermal energy.
The objective is to support the integration of geothermal heat and power in the energy system and as a baseload source of energy with the aim to reduce emissions of greenhouse gases, in line with the EU and national renewable energy targets. The project will also contribute to further innovative technologies in the energy sector and thus support learning-by-doing and positive knowledge externalities.
The Project supports the deployment and integration of a sustainable renewable combined heat and power source (geothermal) applying innovative technologies. It generates positive externalities in the form of reduced greenhouse gases and other hazardous emissions through the switching to a baseload source of sustainable energy. The Project also contributes at increasing learning-by-doing through the first commercialisation stage of an innovative sustainable technology, which should support costs reductions over time. The Project contributes to the 2030 national RE penetration targets of Germany, i.e. 80% RE in the power sector and 65% RE in the heating sector. The Project also contributes to maintaining or increasing safe delivery of energy.
The Project therefore addresses the following market failures: reducing carbon and air pollution externalities, security of supply and costs reduction of innovative low-carbon technologies.
The Project is aligned with EIB's Energy Lending Policy (Decarbonising Energy Supply and Innovation) and Climate Action (Mitigation / Renewable Energy) eligibility criteria and the policy contribution for Renewable Energy Sources is thus rated as Excellent.
The Project also complies with the eligibility criteria set out in Annex I-A of the InvestEU Agreement, in particular in relation to eligibility as per article 8.2, as the operation falls under the Thematic product (generation of clean, safe and sustainable renewable energy sources and solutions), through a technology at TRL 8. As a first-of-a kind commercial demonstration operation, the Project entails a
number of risks (credit, tehnology, construction, offtake) which cannot be fully mitigated due to its early-stage nature. This is combined with the limited experience of the Promoter as a start-up company.
EIB will be a key lender that will provide adequate terms and capacity to attract other specialized institutions to complete the funding plan of this project. The EIB financing further complements the EU Innovation Fund grant to provide a financial package which covers the distinctive risks of the Project. The Project would therefore not have been carried out (to the same extent) by the EIB without the InvestEU support.
Based on their technical characteristics, the subsurface components of the project fall within Annex II of the Environmental Impact Assessment Directive (EIA) 2014/52/EU amending 2011/92/EU, which requires the national competent authority to determine the need for an EIA. The EIA screening-out decision was issued in 2021 and the project main operating plan (Hauptbetriebsplan) was approved in 2022. The environmental impacts are overall expected to be minor and mostly temporary during construction. The specific impacts related to drilling, completion and subsurface operations are expected to be limited with the implementation of appropriate mitigation measures and as the geothermal subsurface system will operate as a closed loop.
The promoter, as a private undertaking operating in the utility sector, is not subject to the EU Public Procurement Directives. The project, which will be supplying utilities already active in the energy sector, is deemed to not benefit from any special or exclusive rights, within the meaning of the Utilities Directives. Therefore, the private procurement procedures used by the promoter are acceptable for the project.
Documents
À la une
Au cœur du projet
Pourquoi et comment
Le projet Eavor à Geretsried
Pourquoi
- La géothermie, c’est de l’énergie propre.
- Elle contribue à la réduction des émissions dues aux combustibles fossiles.
- Elle permet d’accélérer la transition énergétique en Allemagne.
Comment
- L’énergie géothermique provenant des roches souterraines est disponible partout, toute l’année.
- L’Eavor-Loop émet moins de gaz à effet de serre que les systèmes géothermiques conventionnels.
- La chaleur produite permettra de remplacer les chaudières à gaz et d’éviter ainsi le rejet de 45 000 tonnes de dioxyde de carbone par an.
Secteurs et pays
Regarder la vidéo
4:13

« La combinaison de solutions éoliennes, solaires et géothermiques profondes est très intéressante pour assurer la sécurité de l’approvisionnement énergétique pour une grande économie comme celle de l’Allemagne. »
Sur le même sujet
Un modèle vert en Afrique
De la tourbe à l’éolien
Projets et articles associés
Global Gateway : la BEI et la CAF s’associent pour soutenir la croissance durable en Amérique latine
La Banque européenne d’investissement (BEI) et la Banque de développement d’Amérique latine et des Caraïbes (CAF) se sont engagées dans une étape importante vers l’intensification de la coopération internationale au développement, en signant un protocole d’accord ce jour, dans le cadre de la réunion de haut niveau avec les ministres des finances de la Communauté des États latino-américains et des Caraïbes (CELAC) et des institutions financières œuvrant dans la région de l’Amérique latine et des Caraïbes, avant la quatrième Conférence internationale sur le financement du développement (FfD4) organisée à Séville.
Joint Statement: Heads of Multilateral Development Banks commit to strong joint action on development priorities
The Heads of Multilateral Development Banks (MDBs) met today in Paris, hosted by the Council of Europe Development Bank (CEB), which currently chairs the Heads of MDBs Group. The meeting focused on advancing their joint efforts to address development priorities.
EIB Group and European Commission simplify application of State Aid rules to support Europe’s clean industry and hold roundtable with business leaders
The European Investment Bank Group and the European Commission agreed to simplify State aid rules in relation to EIB Group financing, in a step to further facilitate support for Europe’s industry and economic competitiveness.