Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Summary sheet

Release date
20 September 2022
Status
Reference
Approved | 17/11/2022
20210502
Project name
Promoter - financial intermediary
CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445)
THE COMPANY FOR MANAGEMENT OF THE PUBLIC RAILWAY INFRASTRUCTURE SERBIAN RAILWAYS INFRASTRUCTURE LLC BELGRADE
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 140 million
EUR 414 million
Location
Sector(s)
Description
Objectives

The project consists of upgrading to 160 km/h and track duplication of the section Stalac-Djunis of the line Belgrade-Nis railway line.

The project is part of a framework of schemes targeting upgrading and modernisation of the railway line "Belgrade-Nis" (approx. 230 km). It contributes to the development of economic infrastructure, in particular transport. It is located on the core Trans-European Transport Network (TEN-T), as extended to specific neighbouring countries based on high-level agreements on transport infrastructure. By facilitating rail transport, the project will contribute to the competitiveness of the country's economy. The project will increase the quality, availability and reliability of rail services in Serbia, and contribute to the modal shift from roads to rail. It will generate time and vehicle operating costs savings, reduce the maintenance costs of the infrastructure, improve railway and road safety and present environmental benefits, including climate change mitigation.

Environmental aspects
Procurement

If situated in the EU, the project would fall within Annex I of Directive 2011/92/EU as amended by Directive 2014/52/EU (the EIA Directive) and therefore be subject to an environmental impact assessment (EIA). An EIA was carried out in accordance with the national legislation. Conformity with the EIB environmental and social standards, including concerning the impact on any protected sites will be analysed during the appraisal. The project will require some physical and economic resettlement for construction of the tracks on new alignment. Conformity of the resettlement with the EIB social standards will be analysed during the appraisal.

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Comments

The proposed operation is expected to be covered by the comprehensive guarantee granted to the EIB under the Dedicated Investment Window 1 of EFSD+, established by the Neighbourhood, Development and International Cooperation Instrument (NDICI) Global Europe.

Related projects

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445) - ESIA plus annexes
Publication Date
23 Aug 2022
Document language
Main Topic
Lending
Document Number
159717432
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445) - Supplementary environmental studies
Publication Date
23 Aug 2022
Document language
Main Topic
Lending
Document Number
159710119
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Resettlement Action Plan (RAP) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445)
Publication Date
23 Aug 2022
Document language
Main Topic
Lending
Document Number
159360410
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Resettlement Action Plan (RAP) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445) - AKCIONI PLAN RASELJAVANJA
Publication Date
23 Aug 2022
Document language
Main Topic
Lending
Document Number
159360427
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445) - DOPUNSKA STUDIJA
Publication Date
21 Sep 2022
Document language
Main Topic
Lending
Document Number
159717229
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445) - STUDIJA O PROCENI UTICAJA NA ŽIVOTNU SREDINU
Publication Date
20 Sep 2022
Document language
Main Topic
Lending
Document Number
159360432
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - CORRIDOR X SECTION STALAC-DJUNIS (FL 2021-0445)
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
156443964
Document Focus
Environmental Information
Project Number
20210502
Sector(s)
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications