    Signature(s)

    Amount
    € 142,101,523.64
    Countries
    Sector(s)
    Czech Republic : € 142,101,523.64
    Energy : € 142,101,523.64
    Signature date(s)
    14/12/2021 : € 142,101,523.64

    Summary sheet

    Release date
    16 July 2021
    Status
    Reference
    Signed | 14/12/2021
    20210496
    Project name
    Promoter - financial intermediary
    CEPS TRANSMISSION NETWORK UPGRADE - GREEN LOAN
    CEPS AS
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    CZK 3600 million (EUR 142 million)
    CZK 4817 million (EUR 190 million)
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project comprises schemes for the reinforcement and modernisation of the electricity transmission network in the Czech Republic, over the period 2021-2025.

    The project is expected to support the efficient operation of the electricity transmission network in the Czech Republic, to increase the capacity of the electricity transmission network and to enable the Promoter to maintain the reliability and quality of electricity supply.

    Additionality and Impact

    The project supports the reinforcement and modernization of the electricity transmission network in the Czech Republic. EIB's financing will enable the promoter to implement its investment programme and to support the efficient operation of the network in a context of increasing transit and loop flows. The project will support improved quality of service, reliability and security of supply that have public good attributes and will enable the integration of RES generation, in line with national and EU policies and targets. In line with the EU Taxonomy, electricity grid infrastructure in Europe is considered eligible for climate change mitigation. The financing of this project is in line with the Bank's lending priority objectives on Energy as well as the transversal objectives on Climate Action, Environmental Sustainability and Social and Economic Cohesion. The project is expected to deliver fair economic benefits and good social benefits. The promoter is experienced in works of this nature and has a sound project management system in place. The Client will benefit from the flexibility of the EIB financing enabling the optimization of their cash flow needs. The pricing, availability period as well as longer grace period add to attractiveness of the mutual co-operation.


    Environmental aspects
    Procurement

    The project comprises electricity transmission schemes (overhead lines and works in existing substations), some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the schemes will fall under Annex II, thus requiring the competent national authority to determine the need for an EIA. The main impacts that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction.

    The Bank will require that the Promoter ensure that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - CEPS TRANSMISSION NETWORK UPGRADE - GREEN LOAN - Links to EIA report
    Publication Date
    2 Nov 2021
    Document language
    Main Topic
    Lending
    Document Number
    150783916
    Document Focus
    Environmental Information
    Project Number
    20210496
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - CEPS TRANSMISSION NETWORK UPGRADE - GREEN LOAN
    Publication Date
    15 Dec 2021
    Document language
    Main Topic
    Lending
    Document Number
    150177426
    Document Focus
    Environmental Information
    Project Number
    20210496
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications