    Amount
    € 150,000,000
    Countries
    Sector(s)
    Austria : € 150,000,000
    Water, sewerage : € 39,000,000
    Energy : € 111,000,000
    Signature date(s)
    11/12/2019 : € 39,000,000
    11/12/2019 : € 111,000,000

    Summary sheet

    Release date
    19 June 2019
    Status
    Reference
    Signed | 11/12/2019
    20190351
    Project name
    Promoter - financial intermediary
    SMART GRID AND WATER INFRASTRUCTURE LINZ
    LINZ AG FUER ENERGIE TELEKOMMUNIKATION VERKEHR UND KOMMUNALE DIENSTE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 150 million
    EUR 300 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project consists of the deployment of an electricity distribution grid, smart grid and smart metering as well as of the refurbishment of the water infrastructure in the city of Linz in Austria and its surrounding region. The promoter is the licensed Distribution Network Operator (DNO) in the Linz and Upper Austria region of Austria and in charge of water and wastewater services in the city of Linz.

    This project will improve the promoter's electricity network, water supply system, sewer network and wastewater services.

    Environmental aspects
    Procurement

    The electricity networks part of the programme comprises the implementation of a number of electricity distribution schemes from low voltage up to 110 kilovolts (kV). The programme schemes fall under Annex II of Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU, which requires the competent national authority to determine the need for an EIA. Electricity distribution lines at medium and low voltage are typically implemented with low or insignificant environmental impact. The water and wastewater part of the programme mainly consists of the rehabilitation of existing infrastructure such as water mains, reservoirs and sewers, as well as the modernisation of the wastewater treatment plant. However, there are also some new facilities. All components are expected to comply with relevant EU directives (Urban Wastewater directive EC 91/271/EEC, Drinking Water Directive 98/83/EC and Water Framework Directive 2000/60/EC). Some of the water schemes are likely to require an Environmental Impact Assessment. Therefore, the promoter will be required to comply with Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The promoter must also comply with the requirements of the Water Framework Directive, including Art 4(7) where appropriate. According to the available information, the sub-projects are not within any Natura 2000 zones. This will be further analysed during the appraisal.

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and/or 2014/24/EU and/or 2014/23/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC), as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - SMART GRID AND WATER INFRASTRUCTURE LINZ
    Publication Date
    21 Dec 2019
    Document language
    Main Topic
    Lending
    Document Number
    95067321
    Document Focus
    Environmental Information
    Project Number
    20190351
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications