Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    26 June 2018
    Status
    Reference
    Approved | 03/09/2018
    20180025
    Project name
    Promoter - financial intermediary
    RIVER BASINS FLOOD PREVENTION (FL 20160625)
    PUBLIC ENTITY(IES)
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 38 million
    EUR 78 million
    Location
    Sector(s)
    Description
    Objectives

    The project will finance the construction of several infrastructures along river Arno and its tributaries in the Region of Tuscany in order to reduce flood impacts

    The project will improve the quality of life of approximately 150,000 inhabitants in the region of Tuscany by reducing the impacts of floods of the river Arno and its tributaries, including the city of Florence. The wider economic benefits generated by the project consist in improving the protection of human health, the environment, cultural heritage and economic activities. Investing in flood protection and mitigation will increase the resilience of the region to natural disasters and climate change, thus contribute to long-term sustainable growth in the area.

    Environmental aspects
    Procurement

    The investment is geared towards flood protection and mitigation measures on the river Arno bringing about positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), the Floods Directive (2007/60/EC) and EU and national environmental legislation (notably under Environmental impact assessment (EIA) Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC) will be verified during appraisal.

    The Bank will require the project promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Comments

    n/a

    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - RIVER BASINS FLOOD PREVENTION (FL 20160625)
    Publication Date
    11 Oct 2018
    Document language
    Main Topic
    Lending
    Document Number
    83541594
    Document Focus
    Environmental Information
    Project Number
    20180025
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications